User Tools

Site Tools


2014p5ccrdr023

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
2014p5ccrdr023 [05/11/2020 20:11 UTC]
Tanner Scott removed
— (current)
Line 1: Line 1:
-======2014-P 5c CRDR-023====== 
-=====Description===== 
-The left side of the doorway ceiling is lightly doubled to the south. \\ 
  
-**Cross-References:** WDDR-002 \\ 
- 
-**Die Markers:** \\ 
-**Obverse:** **Stage A:** Die gouge to the right of the E in WE. **Stage B:** Same as Stage A. \\ 
-**Reverse:** **Stage A:** Die crack runs through the tops of the STA in STATES. Die crack curves north from the top right of the building. Die gouge in the lower portion of the E in E PLURIBUS UNUM. Die gouge to the right of the S in PLURIBUS. **Stage B:** Stage A markers still present. Die crack through STA now extends through STATE and ends above the D in UNITED. Die chip formed between the designers initials FS and the building. Die chip formed inside the upper portion of the S in CENTS. \\ 
- 
-Submitted by: Tanner Scott 
- 
-=====Images===== 
-{{:14p5ccrdr23_1_.jpeg?400|}} 
-{{:14p5ccrdr23_2_.jpeg?400|}} 
-{{:14p5ccrdr23_3_.jpeg?400|}} 
-{{:14p5ccrdr23_4_.jpeg?400|}} 
-{{:14p5ccrdr23_5_.jpeg?400|}} 
-{{:14p5ccrdr23_6_.jpeg?400|}} 
-{{:14p5ccrdr23_7_.jpeg?400|}} 
-{{:14p5ccrdr23_8_.jpeg?400|}} 
-{{:14p5ccrdr23_9_.jpeg?400|}} 
2014p5ccrdr023.1589227861.txt.gz ยท Last modified: 05/11/2020 20:11 UTC by Tanner Scott