Differences
This shows you the differences between two versions of the page.
|
Next revision
|
Previous revision
|
jn22018p [02/16/2020 19:09 UTC] Tanner Scott created |
jn22018p [05/01/2022 03:38 UTC] (current) Tanner Scott ↷ Links adapted because of a move operation |
| ======2018-P Jefferson Nickel Die Varieties====== | ======2018-P Jefferson Nickel Die Varieties====== |
| \\ | |
| =====Doubled Die Reverses===== | =====Doubled Die Reverses===== |
| ^ Designation ^ Description ^ Image ^ | ^ Designation ^ Description ^ Image ^ |
| | [[2018p5ccrdr001|CRDR-001]] | The left side of the triangular window is doubled to the southwest. \\ \\ **Die Markers:** \\ **Obverse:** Die gouge inside the U in TRUST. \\ **Reverse:** Pre-die break depression on the left side of the building. Multiple die breaks and pre-die break depressions on the right side of the building. Die chips on the left side of the dome. Die gouge near the rim above the right side of the building. Many NW-SE die scratches to the right of the dome. | {{:18p5ccrdr1_1_.jpeg?1900|}} | | | [[2018p5cSDdr001|SDDR-001]] | The left side of the triangular window is doubled to the southwest. \\ \\ **Die Markers:** \\ **Obverse:** Die gouge inside the U in TRUST. \\ **Reverse:** Pre-die break depression on the left side of the building. Multiple die breaks and pre-die break depressions on the right side of the building. Die chips on the left side of the dome. Die gouge near the rim above the right side of the building. Many NW-SE die scratches to the right of the dome. | {{scott5c:18p5ccrdr1_1_.jpeg?1900|}} | |
| ^ Designation ^ Description ^ Image ^ | ^ Designation ^ Description ^ Image ^ |
| | [[2018p5ccrdr002|CRDR-002]] | The upper left corner of the doorway is doubled to the southwest. \\ \\ **Die Markers:** \\ **Obverse:** Die gouge inside the U in TRUST. \\ **Reverse:** Pre-die break depression on the left side of the building. Die break between the designers initials FS and the building. | {{:18p5ccrdr2_1_.jpeg?400|}} | | | [[2018p5cSDdr002|SDDR-002]] | The upper left corner of the doorway is doubled to the southwest. \\ \\ **Die Markers:** \\ **Obverse:** Die gouge inside the U in TRUST. \\ **Reverse:** Pre-die break depression on the left side of the building. Die break between the designers initials FS and the building. | {{scott5c:18p5ccrdr2_1_.jpeg?400|}} | |